Owner
- Older panels keep working instead of being torn off.
- Rust is stopped before panels thin further.
- A coated roof can be recoated in the future.

As a Crawfordsville metal roof coating contractor, we bring older steel roofs back with careful prep, new screws, primed rust, and a reinforced coat.

Crawfordsville metal roof coating jobs often start on roofs that have carried decades of weather on the same panels.
On those roofs, prep is most of the job. Chalky paint, rusted eaves, and dried washers all get handled before any coat goes on, and every repair is written down so you can see where the money goes.
Older roofs show the same signs. Here is what we fix before coating.
Decades of sun leave a powder that wipes off on a glove. It is washed away so primer reaches firm paint underneath.
Original rubber washers crack and let water in at every screw. Each one is replaced with a new screw and washer.
Snow and meltwater sit at the eaves longest. Rust there is brushed back, probed, and primed.
End laps sometimes rust through completely. Those panel ends are cut back and replaced.
Mastic patches from past repairs are tested for adhesion, and loose material is scraped off down to clean steel.
Restoring an older steel roof helps each person tied to the building.
Older steel roofs in Crawfordsville use these systems most.

Primed rust, new screws, sealed laps, and a reinforced field coat over the old panels. It is the most common job on older steel roofs here.
Silicone covers eaves and gutters where meltwater sits through winter. It ties into the field coat above the gutter line.

Acrylic covers well-drained slopes once rust is primed. Two colors show any thin spots on worn paint.

Foam seals an older roof with leaks at nearly every lap. It also adds insulation the original building lacked.

Shingled offices on the same property get their own coating. Each shingle roof gets an adhesion test first.

Check a ballpark range for coating next to replacement, then let us walk the roof and probe the rust.
Older roofs need extra prep. Here is the order.
We probe rust, check every washer row, test old patches, and take moisture readings. The written repair list comes before any price.
Rusted-through panel ends are replaced, and screws and washers renewed row by row. Stitch screws close any lap that has opened.
Loose patching is scraped, the roof washed, and rust primed to firm steel. Chalky paint gets a primer made for weathered finishes.
Roof sections are set with the owner so shops and storage keep running. Lifts are placed where they keep doors clear.
Laps and screw rows get fabric, then the field coat goes on with thickness readings. Photos and readings go into your file.
Besides Crawfordsville, we take coating work in four more towns. Elsewhere? call us or send us a message.
Lab and office roofs where intakes set the schedule.
Plant roofs with fans and curbs to rebuild.
Farm and equipment roofs on open ground.
Metal shops suited to spray foam.
Answers on prep, cost, and finding a contractor nearby.
Usually a pressure wash, removal of loose rust and paint, primer on bare steel, new screws and washers, and reinforced coats at laps and penetrations. Panels thinned by rust are replaced. On older roofs, that prep makes up a large share of the job.
Plan on about $2.50 to $4.00 per square foot for coating, against about $5 to $8 for replacement. On older roofs, the amount of rust, the number of screws and washers to replace, and any panel ends that need cutting out move the price most. The final number follows the roof walk.
Yes. We cover Crawfordsville from Lafayette, south down the highway. Call with the building address and tell us what you see inside, such as stains along a wall or drips at the eaves, and we will set up a roof walk to find where the water starts.
We take older shops and plants in Crawfordsville, starting with a roof walk and a written repair list. Older roofs hide their worst rust under dirt and patching, so we probe and test before pricing anything. You see the photos and decide which repairs come first.
Each screw seals through a rubber washer, and on an older roof thousands of them have dried and split. One failed washer is a small leak, but a whole roof of them lets water in at every rib, so washers are renewed before coating.
We probe the worst areas with a pick and a hammer. Surface rust brushes away to firm steel, while thinned steel flakes or gives. Panels that give are replaced, and the rest is primed.
Often, yes. Loose patching is scraped off, the roof is washed, and an adhesion test on the old material shows whether coating will bond to it. Where it holds, the patches are primed and coated over. Where it peels, the patching is removed down to clean steel.
Book a roof walk and get a written list of every repair before any price.